Instructions: Fill in the required information. When finished,
save the form on your computer as a pdf document
to be merged with the discussion section of your proposal.
Principal Investigator
Lead Observer (if not PI)
Name:
E-mail:
Office phone:
[The PI or the Lead Observer will be the single-point contact with the Palomar staff for all administrative and
logistical matters pertaining to the project.]
Program Title
Summary of Program (Maxmimum 100 words)
Institution
Status¹
Priority
Linked to Keck¹
Linked to 60-in¹
Linked to Oschin¹
Thesis Project
ToO Interrupts¹
Large Project¹
Date-Specific²
Black-out Dates²
Secondary instrument²
Own Equipment²
Partial Nights²
¹Caltech observers only
²Provide full details in the discussion section
Collaborators (Names and e-mail addresses)
Observing Team (Observers expected to be present at Palomar)
Observing Runs & Instruments Fill in the table below to specify the instruments requested and your acceptable
observing runs.
- Select the instrument you are requesting from the pull-down menu in the Instrument column.
- Enter the number of nights you are requesting.
- Specify your observing preferences as P = Preferred or A = Acceptable
- Use multiple request lines if you (a) want your observing time split into two or more runs (one line for each
block) and/or (b) need more than one instrument for this project.
L = Light (<28% moon-free)
D = Dark (>72% moon-free)
DE = Grey Dark Early (28%-72% moon-free)
DL = Grey Dark Late (28%-72% moon-free)
Observing Time Preference & Instrument Selection 2013B
From
01 Aug
02 Aug
13 Aug
17 Aug
27 Aug
31 Aug
11 Sep
15 Sep
25 Sep
30 Sep
To
01 Aug
12 Aug
16 Aug
26 Aug
30 Aug
10 Sep
14 Sep
24 Sep
29 Sep
09 Oct
Instrument
Nights
Run
7DE
7D
7DL
8L
8DE
8D
8DL
9L
9DE
9D
Req1
Req2
Req3
Req4
Req5
Req6
*For Own Equip, provide full description in proposal discussion.
From
10 Oct
14 Oct
24 Oct
29 Oct
07 Nov
12 Nov
23 Nov
28 Nov
07 Dec
11 Dec
22 Dec
27 Dec
05 Jan
10 Jan
21 Jan
25 Jan
To
13 Oct
23 Oct
28 Oct
06 Nov
11 Nov
22 Nov
27 Nov
06 Dec
10 Dec
21 Dec
26 Dec
04 Jan
09 Jan
20 Jan
24 Jan
31 Jan
Run
9DL
10L
10DE
10D
10DL
11L
11DE
11D
11DL
12L
12DE
12D
12DL
13L
13DE
13D
Req1
Req2
Req3
Req4
Req5
Req6
Semester 2013B Palomar Cover Sheet 200-in
Last updated: 31 January 2013 - RJB/AFB