Study Schedule


Home
TiPi Team Members
Project
Study Schedule
Reference Doco
Education and Public Outreach

Timeline for Milestones
June 2005
13 - Project Start
July
TBD - All-Hands Project Meeting
August
1-6 - Jarle and Bob visit to Caltech
September
13 - Draft Initial OCDD Due to TMT Project Office
October
13 - Draft Initial FPRD Due to TMT Project Office
19 - IRMOS Mtg at UCSC
November
13 - IOCDD Due to TMT
December
13 - IFPRD Due to TMT
January 2006
13 - Feasibility Study Report (FSR) Outline Due
TBD - TiPi All Hands Project Meeting
February
15 - FSR Due to TMT (change to original SOW)
March
16 - IRMOS-TiPi Feasibility Study Review by TMT Project
April
14 - Revised Final FSR Due to TMT (see 2/15/06)
September
25-29 - TMT Project Cost Review
September 2007
24-28 - TMT Project Preliminary Design Review (PDR)
Major Work Package Tasks
  1. Expand the IRMOS science case that examines the importance and technical impact of applications beyond the focused distant galaxy surveys given the highest priority in the SRD.
  2. Develop IRMOS functional requirements based on scientific source and performance modeling, emphasizing architectures using current technologies and modest advances over the state-of-the-art
  3. Perform cost and risk trade studies to determine the most conservative approach to obtaining IRMOS science capability.
  4. Develop feasible optomechanical designs
  5. Define the Observatory interfaces to IRMOS
  6. Develop feasible control architecture and data handling capabilities
  7. Develop a budgeted plan for a Conceptual Design study for IRMOS

Action Items

  1. Standing IPT Meeting Every Monday @ 8:30am (PDT) [Integrated Product (Engineering) Team]

Home | TiPi Team Members | Project | Study Schedule | Reference Doco | Education and Public Outreach

 All material posted here is proprietary and should be referenced with citation to the document author and the TMT IRMOS TiPi feasibility study.
For problems or questions regarding this Web site contact rgd@astro.caltech.edu
Last updated: 06/22/05.