This Table of Contents represents the information which exists and which we hope to soon make available. Links denote those items which have been located on the web page already, sometimes in preliminary form. Last updated by Roger Smith, 2004 March 29
Return to Main KIRMOS Web page
Link to Chapter 11 of PDR report - Detectors
Overview of Status, 2004, March 30
14.8.1 KIRMOS Interface Control Document, Detector Module: v1.1
14.8.2 KIRMOS General Design Note 2.0, Detector Head Assembly (Preliminary Design Issues)
14.8.3 KIMROS General Design Note 1.0, Detector Motion
Table of Contents
Introduction
Drawings for extended IR labs ND8
Worksurface heater (wiring, thermal perfromance and tuning)
Autofill with servo controlled cooling rate
Hold time measurements
Light sources (LEDs, 3 colors)
Description
Disassembly concept
Detector & mount installation photos.
Thermal design calculations (Excel spreadsheet)
Flex circuit designs
Thermal performance
Focal plane mask designsH2RG and VIRGO detector mounts (Solidworks eDrawing, Windows executable)
Dewar + electronics box (Solidworks, eDrawing, Windows executable)
32 Channel ARC Inc (Leach-3) controller for HAWAII-2RG description
16 Channel ARC Inc (Leach-3) controller for VIRGO-2K description
Arcview softwarePerformance tests:
Bias noise spectra, filtering
Video gain and filtering
Differential non-linearity
H2RG Multiplexor tests
Timing waveforms
Verification of pixel unscrambling
Bias voltages
Bias to video transfer functions
Noise & intereference sources
VIRGO-2K Multiplexor tests
Timing waveforms
Verification of pixel unscrambling
Bias voltages
Bias to video transfer functions
Noise & intereference sources