next up previous contents
Next: Verify OBSERVING software Up: Setup Previous: Install calibration lamp

Verify instrument operation

 Now that the Fabry-Perot hardware is almost completely assembled, you should proceed to the control room to test the system. If you are observing at the 60-inch telescope, first turn off the lights in the dome, and turn on the calibration lamp.



 

Patrick Shopbell
4/23/2001