BICEP online cryostat monitor

You are experiencing RUN 8 (7/5/2005): BICEP is back in action and better than ever :-)

Cryostatus is changing from gfridge to netdatatest output...watch for updates...

Buddy and Cap'n Squid say: "Light goes in, signal comes out!"


Last website update: Thu Aug 25 09:02:04 PDT 2005
Plots updated every 15 minutes; refresh or shift-refresh your browser for most recent ones
Plots are shown for full run time, and last two hours


Current helium level: 34.38 inches (Thu Aug 25 09:00:10 PDT 2005)


Focal plane temperatures:


Evaporator temperatures:


Heat switch temperatures:


Pump temperatures:


Pump voltages:


Heat switch voltages:


Pump currents:


Heat switch currents:


Electronics box temperatures:


Powered by PAW
Bugs? Email Cynthia: hsin@its.caltech.edu