pics : BICEP : 0312 pole trip : crane lift I

Up


The first crane lift was Monday morning, 15 Dec, 6:00 am. We flew off the old DASI faceplate and with the crane waiting, replaced the inner seal plates and outer brush seal to their original heights. We did test fits of the plenum ring and triangle arm; the plenum ring rode .500"-.600" too high, which we attributed to the new plate being thinner than drawn and the old insulation panel (which sets the height of the brush seal) being thicker than drawn.

( Click once for medium sized image. Click again for full size. )
100 0144
100 0144

100 0146
100 0146

100 0147
100 0147

100 0149
100 0149

100 0150
100 0150

100 0152
100 0152

100 0153
100 0153

100 0154
100 0154

100 0158
100 0158

100 0159
100 0159

100 0160
100 0160

100 0163
100 0163

100 0168
100 0168

100 0170
100 0170

100 0171
100 0171

100 0172
100 0172

100 0174
100 0174

100 0176
100 0176


Photo album generated by album from Dave's MarginalHacks on Wed Oct 27 14:38:28 2004