Action Items

ActionStatusTeam members
Basic mechanical designCompleteCDM, NML
Basic optical designCompleteCDM, NML
PALMAO/P200 hardware interfaceCompleteNML, CDM
Polarimetry systemOrderedMI
New PALMAO beamsplitterOrdered, arrival 1 JuneNML
AM + Pol. modes mechanical designCompleteMI, PT, CDM
Finalize mechanical detailsCompleteCDM, NML
Rotating filterCompletePT, HW
Get software specs for rotating filterCompletePT, HW
ADC performance modellingCompleteNML, MI
ADC software control & testingHardware control completeNML
Select a final main-wheel filter listIn progressAll (talk to NML)
AM + polarimetry software controlDesign completeNML, MI, PT
Final build & test LAMPComplete, no problemsCDM,NML
Decide schedule & team for runCompleteAll
Go to P200, do brilliant scienceTo doAll




Schedule

DateSchedule
Early AprilDesign fully complete
1 April - 5 MayParts arrive at Cambridge (most already there)
1 May - 20 MayBuild & test at Cambridge (CDM, NML)
25 May (approx) Ship to Palomar
1 JuneNew beamsplitter arrives at Palomar
10-15 JuneLAMP arrives at Palomar (14 days nominal shipping)
26 June NML to Palomar, unpack LAMP
29 June CDM to Palomar
27 June + Rest of team to Palomar
28-1 JulyAlignment & testing on PALMAO (off telescope)
2 July, afternoonPALMAO + LAMP move to P200
2-7 JulyObservations on P200
7-8 JulyRemove from P200 + PALMAO, pack up

Confirmed with Pickles 4/4/07



The Team

Rich DekanyCaltechCOO liaison
Mike IrelandCaltechHigh-contrast polarimetry
Nicholas LawCaltechPI, software, design
Craig MackayIOA, CambridgeL3CCD system, design
Anna MooreCaltechP200 & PALMAO interface
James LloydCornellAperture masking
Gordon RobertsonSydneyAperture masking
Peter TuthillSydneyAperture masking
Henry WoodruffSydneyAperture masking


E-mail list for whole-team mails

nlaw@astro.caltech.edu, cdm@ast.cam.ac.uk, p.tuthill@physics.usyd.edu.au, h.woodruff@physics.usyd.edu.au, jpl@astro.cornell.edu, g.robertson@physics.usyd.edu.au, mireland@gps.caltech.edu, amoore@astro.caltech.edu, rgd@astro.caltech.edu

Photos (24 May)





CAD models


 

STEP format models:    Full_LuckyCam_Assy_180407.stp (18 April 2007)

Full_LuckyCam_Assy_020307.stp (2 March 2007)




Optical Details

Camera fields

FField of viewmas/pixelzemax file
F/10.4531.7 arcsec62.0lamp_mag1_noadc_bs.zmx
F/15.6821.1 arcsec41.3
F/31.3610.5 arcsec20.7
F/47.047.07 arcsec13.8
F/62.725.27 arcsec10.3

Zemax files include P200, PALMAO & LAMP beamsplitter. ADC to come soon.




Filters

Filter nameCentral WL/nmWidth/nm
LuckyCam filters
400/10 400 10
450/10 450 10
450/40 450 40
500/10 500 10
500/10 500 10
530 LP 530 Long Pass
550/70 (~V) 550 70
600/65 600 65
610 LP 610 Long Pass
SDSS r' 625 140
660/10 660 10
665 LP 665 Long Pass
670/10 670 10
685/10 685 10
710/10 710 10
715 LP 715 Long Pass
715 LP 715 Long Pass (AR coated)
730/10 730 10
760/10 760 10
SDSS i' 770 160
780 LP 780 Long Pass
SDSS z' 832 Long Pass
850 LP 850 Long Pass
Aperture masking filters
611.83 10.0
656.3 0.15
656.2 0.3
655.6 1.0
657.0 1.0
749.8 18.0
950.16 40.15
1004.4 36.2

The LuckyCam SDSS and long-pass filters are high-performance and good quality. The other LuckyCam filters are relatively low cost (fairly low transmission). All filters are 25mm diameter.

Documents

Hardware & Optical Design

New PALMAO Beamsplitter specs & quote (we're getting the higher-quality option)

Notes from visit to Palomar to check instrument mounting plans (16 Apr 07)

Aperture Masking

Flux calculations (Woody)

Aperture masking in LAMP, details (Woody)

Recent Presentations

P3K meeting Feb 2007 (PPT) (Nick)

CfAO retreat March 2007 (Nick) PPT PDF

Proposals

Outflows from Symbiotic Binaries (Nick)

High-contrast polarimetry (Mike)

Mira winds (Peter & Jamie)